"ZBPW BOARD APPROVES 2018-2022 STRATEGIC PLAN"
TO REVIEW THE PLAN CLICK ON "STRATEGIC PLAN 2018-2022" BELOW

LATEST WATER LEAD MONITORING:
ZBPW TEST RESULTS AT 90TH PERCENTILE; 0 PARTS PER BILLION (NO DETECTABLE LEVELS OF LEAD)

ZBPW RECEIVES AMERICAN PUBLIC POWER ASSOCIATION
EXCELLENCE IN ELECTRIC RELIABILITY AWARD FOR 2016 and 2017

ANNUAL WATER QUALITY REPORT AVAILABLE FOR 2017

ZBPW WATER SUPPLY TESTING RESULTS SHOW NO DETECTION OF PFAS

POWER DOLLARS NOVEMBER 26 - DECEMBER 7 , 2018

09

Sun

52° F

05:02 PM

Electric Connection Charges

Effective: July 1, 2018

SEE SECTION XI  of Zeeland Board of Public Works – Rules and Regulations for Electric Service  for full detail.
Single – Family Residential:

Overhead Distribution System to Overhead Service
$200 Connection Fee (includes wire to 100 feet)

Overhead Distribution System to Underground Service
$200 Connection Fee & $75 Riser Fee plus $3.75 per trench foot, or $6.00 per boring foot

Underground Distribution System
$200 Connection Fee plus $3.75 per trench foot, or $6.00 per boring foot

Mobile Homes (Within Mobile Home Park)
$200 Connection Fee – ZBPW furnishes and installs wire to service point

Multi – Family Residential (2-4 Units)

New Service – Developer furnishes and installs wire from meter(s) to service point:
$50 per unit Connection Fee

New Service – ZBPW furnishes and installs wire from meter(s) to service point:
$50 per unit Connection Fee plus $5.50 per trench foot, or $8.00 per boring foot

Commercial/Industrial

Overhead Distribution System to Overhead Service

  • $250 Connection Fee – single phase (includes wire to 100 feet)
  • $400 Connection Fee – three phase (includes wire to 100 feet)

Overhead Distribution System to Underground Service

  • Single phase – $250 Connection & $125 Riser Fee – plus $5.55 per trench foot, or $8.25 per boring foot
  • Three phase – $450 Connection & $425 Rise Fee – plus $9.75 per trench foot, or $15.25 per boring foot

Underground Distribution System to Underground  Service

  • Provided by Owner – Underground wire and installation from building to service point and a transformer pad (per ZBPW specifications)
  • Single phase – $250 Connection Fee – plus $5.50 per trench foot (Property line to service pt), or $8.25 per boring foot
  • Three phase – $500 Connection Fee – plus $9.75 per trench foot (Property line to service pt), or $15.25 per boring foot
Winter Premium (all services)

The charge for underground installations between November 15 and April 1 will be increase by $1.75 per foot, due to weather conditions.

Temporary Service – $75-       NOTE: Additional charges possible to cover contribution in aid of construction if necessary

 To view a complete listing of Zeeland Board of Public Works Electric Fees and Charges See Schedule XI of the following Electric Rules and Regulations:   