Electric Connection Charges

Effective: July 1, 2017

SEE SECTION XI  of Zeeland Board of Public Works – Rules and Regulations for Electric Service  for full detail.
Single – Family Residential:

Overhead Distribution System to Overhead Service
$200 Connection Fee (includes wire to 100 feet)

Overhead Distribution System to Underground Service
$200 Connection Fee & $75 Riser Fee plus $3.75 per trench foot, or $6.00 per boring foot

Underground Distribution System
$200 Connection Fee plus $3.75 per trench foot, or $6.00 per boring foot

Mobile Homes (Within Mobile Home Park)
$200 Connection Fee – ZBPW furnishes and installs wire to service point

Multi – Family Residential (2-4 Units)

New Service – Developer furnishes and installs wire from meter(s) to service point:
$50 per unit Connection Fee

New Service – ZBPW furnishes and installs wire from meter(s) to service point:
$50 per unit Connection Fee plus $5.50 per trench foot, or $8.00 per boring foot

Commercial/Industrial

Overhead Distribution System to Overhead Service

  • $250 Connection Fee – single phase (includes wire to 100 feet)
  • $400 Connection Fee – three phase (includes wire to 100 feet)

Overhead Distribution System to Underground Service

  • Single phase – $250 Connection & $125 Riser Fee – plus $5.55 per trench foot, or $8.25 per boring foot
  • Three phase – $450 Connection & $425 Rise Fee – plus $9.75 per trench foot, or $15.25 per boring foot

Underground Distribution System to Underground  Service

  • Provided by Owner – Underground wire and installation from building to service point and a transformer pad (per ZBPW specifications)
  • Single phase – $250 Connection Fee – plus $5.50 per trench foot (Property line to service pt), or $8.25 per boring foot
  • Three phase – $500 Connection Fee – plus $9.75 per trench foot (Property line to service pt), or $15.25 per boring foot
Winter Premium (all services)

The charge for underground installations between November 15 and April 1 will be increase by $1.75 per foot, due to weather conditions.

Temporary Service – $75

 To view a complete listing of Zeeland Board of Public Works Electric Fees and Charges See Schedule XI of the following Electric Rules and Regulations:   

Rules and Regulations for Electric Service FINAL FY2018