Effective: July 1, 2018
Overhead Distribution System to Overhead Service
$200 Connection Fee (includes wire to 100 feet)
Overhead Distribution System to Underground Service
$200 Connection Fee & $75 Riser Fee plus $3.75 per trench foot, or $6.00 per boring foot
Underground Distribution System
$200 Connection Fee plus $3.75 per trench foot, or $6.00 per boring foot
Mobile Homes (Within Mobile Home Park)
$200 Connection Fee – ZBPW furnishes and installs wire to service point
Overhead Distribution System to Overhead Service
Overhead Distribution System to Underground Service
Underground Distribution System to Underground Service
The charge for underground installations between November 15 and April 1 will be increase by $1.75 per foot, due to weather conditions.
NOTE: Additional charges possible to cover contribution in aid of construction if necessary.
To view a complete listing of Zeeland Board of Public Works Electric Fees and Charges See Schedule XIII of the following Electric Rules and Regulations: