"ZBPW BOARD APPROVES 2018-2022 STRATEGIC PLAN"
TO REVIEW THE PLAN CLICK ON "STRATEGIC PLAN 2018-2022" BELOW

2016 WATER LEAD MONITORING:
ZBPW TEST RESULTS AT 90TH PERCENTILE; 0 PARTS PER BILLION (NO DETECTABLE LEVELS OF LEAD)

MARCH 2017, ZBPW RECEIVES AMERICAN PUBLIC POWER ASSOCIATION
EXCELLENCE IN ELECTRIC RELIABILITY AWARD

AUGUST 2017, ZBPW LOWERS ENERGY OPTIMIZATION FEES

SEPTEMBER 2017, THE ZEELAND BOARD OF PUBLIC WORKS SENT A TWO MAN LINE CREW, BUCKET TRUCK AND REAR LOT LINE MACHINE
TO FT. PIERCE, FLORIDA TO ASSIST IN POWER RESTORATION RESULTING FROM DAMAGE CAUSED BY HURRICANE IRMA.

25

Mon

66° F

03:45 AM

Water Rates

Effective July 1, 2015

Readiness to Serve Charge

Monthly readiness to serve charges are based on size of meter used and does not include the purchase of water.

Meter Size (inches)Readiness to Serve Charge
5/8$6.40
3/4$9.50
1$16.45
1 1/4$25.35
1 1/2$38.00
2$66.00
3$145.00
4$257.00
6$550.00
Commodity Charge

$1.79 ccf*

* A ccf is one hundred cubic feet or approximately 748 gallons.

Fire Protection Charge

Monthly charges for fire protection are based on size (diameter) of each service line. The rate is multiplied by 1.5 if the service is supplied with a fire booster pump.

Service Line Size (inches)Fire Protection Charge
4$30.00
6$67.50
8$120.00
10$187.50
12$270.00
Meter Costs
Service Line Size (inches)Charge
5/8$320.00
3/4$410.00
1$465.00
1 ½$1425.00
2$1620.00

 

To view copies of Zeeland Board of Public Works Current Rate Schedules press on the following:

2017 RATES WEBSITE REFERENCE PDF